Six Secrets to Using Earned Value Management [Infographic]

After a recent question I came across in a LinkedIn group about using earned value management in your projects, I provided some advice and a link to an EVM webinar recording, which in turn became very popular!

Then it got me thinking; this is a topic where everyday project managers can struggle to understand and successfully implement. And what better way to portray some of the key elements in EVM, than an infographic!

Here is a simple definition of earned value: earned value is a way to measure project performance and progress. You take your plan and assign a value for each item or deliverables. Typically, this value is expressed as a monetary value, but hours can be substituted as the measure as well.

As mentioned below, there are 3 elements to earned value (or as it is sometimes called Performance Management):

  1. You need a Project Plan – How you expect to accomplish the project over time
  2. You need to set a value for the deliverable and work that will be performed.
  3. You need to have a standard way to measure how you earn value for completed work.

 

And here are the six secrets: 

 

Click here and watch an on-demand webinar to learn more about Earned Value Management on SharePoint Projects!

1. Define a Task Plan

The first element of earned value management is accomplished by breaking down the work into manageable deliverables and scheduling the completion of each item a Project Schedule or Task Plan.

Microsoft Project or the SharePoint task list can be used to define the Task Plan including what is being accomplished, the effort required, and who will do the work.

Example of a Task Plan in MS Project:

ms project plan earned value management

2. Set the Planned Value

Once the plan is defined, each item is given a expected value for the work accomplished. This value usually includes labor, materials, and any other direct costs to estimate a total value for the deliverable. The estimates becomes our Planned Value for the items. This will be the benchmark that we will compare our actual progress to determine if we are performing to plan and if not, how far off are we.

You can then sync this info into SharePoint:

earned value management sharepoint

The sum of all the items is the Planned Value for the project or commonly called the Budget at Complete. The schedule of how the items get completed is known as the Performance Measurement Baseline.

3. Track Project Plans

Now that the plan is in place and we have our baseline to track against, we now start executing the plan and track the physical progress we accomplish on a regular basis. This is usually monthly on larger projects, but can also be conducted weekly on shorter fast paced projects.

Physical progress can be entered by the responsible resource in SharePoint. Or the Project Manager can get the progress from the team and enter it directly in the Microsoft Project task.

update task sharepoint

4. Calculate Earned Value

Once the current progress is in place, earned value can be calculated and rolled up for the entire project. The progress and actual information is then passed back to SharePoint to be processed for Earned Value Reporting.

Here is an example of how MS Project has calculated cumulative Planned Value, Earned Value, and Actual Value to date for the project.

earned value ms project

 

 

5. Track Actual Costs

Actual Costs can then be entered to accurately calculate the cost variance to date. One way to do this is to use the Fixed Cost column in Microsoft Project to adjust the Actual Cost so they agree with the accounting system.

 

track costs fixed column

6. Analyze Performance

All the Earned Value information is then brought into the SharePoint site and processed to produce simple Earned Value Progress and Performance Reports.

Here is an exampled of 4 analysis charts that show Progress to Date, Cumulative Variances to Date, Performance Indicies for cost and schedule, and current estimates at complete.

earned value management analysis charts in sharepoint

 

 

 

 

 

 

 

 

 

 

 

 

Homepage discussions Six Secrets to Using Earned Value Management [Infographic]

This topic contains 0 replies, has 1 voice, and was last updated by Profile photo of Ciara McDonnell Ciara McDonnell 1 year, 7 months ago.

You must be logged in to reply to this topic.